The first rain couldn’t stand up to the street, the embankment was broken

The Pradhan Mantri Gram Sadak Yojana in Sitapur, Ambikapur is in dangerous form. Here, a two and a half kilometer lengthy street from National Highway Bamalaya to Raikera Tokopara collapsed. The embankment constructed alongside the drainage to stop soil erosion collapsed throughout street development. The first rain uncovered all the development. Due to soil erosion resulting from broken embankment, the street has turn into narrower, rising the possibilities of accident. At the identical time, the situation of the street may be very shabby, it has turn into very troublesome to stroll on it.

The villagers have been held liable for this plight of the street, with the demand of investigation, the villagers have demanded the broken embankment and the street be repaired. Under the Pradhan Mantri Gramin Sadak Yojana, a two and a half kilometer paved street was constructed from National Highway Bamalaya to Raikera Tokopara at a price of 1 crore 34 lakh 51 thousand.