Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Najafgarh Bust: Delhi Crime Branch Arrests Proclaimed Offender Sunil Yadav
    • Chhattisgarh CM: PRAGATI Portal Resolves 91% State Challenges
    • Deepti Sharma’s 55* Guides UP Warriors to 144 Target Against RCB
    • Maritime Diplomacy: 23 Indian Fishermen Home from Bangladesh in Major Exchange
    • Poll Shows Huge Opportunities in China-UK Cooperation
    • SC Halts UGC 2026 Norms: ABVP Celebrates Equality Win
    • Wang Yi-Powell Talks Pave Way for UK PM Starmer’s China Visit After 8 Years
    • Major Vikrant Case: Delhi HC Grants Time for New Affidavit
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»India»Chhattisgarh»The registration of contractor Suresh Chandrakar has been suspended with immediate effect.

    The registration of contractor Suresh Chandrakar has been suspended with immediate effect.

    Chhattisgarh January 8, 20251 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    The registration of contractor Suresh Chandrakar has been suspended with immediate effect.
    Share
    Facebook Twitter LinkedIn Pinterest Email

    All works assigned to him have been cancelled by the Public Works Department.

    Raipur, January 7, 2025. The Public Works Department has suspended the registration of Suresh Chandrakar, a contractor from Bijapur, with immediate effect and cancelled all works assigned to him. The suspension of Suresh Chandrakar’s registration was ordered by the Chief Engineer’s office based on a recommendation from the Divisional Chief Engineer, Bastar Division, Jagdalpur. The Chief Engineer recommended the suspension citing news reports and his arrest as the main accused in the murder of journalist Mukesh Chandrakar, a registered “A” class contractor with the Public Works Department in Bijapur.

    Considering the Chief Engineer’s recommendation, the department has suspended Suresh Chandrakar’s registration with immediate effect. Furthermore, all road construction works assigned to Suresh Chandrakar have been cancelled due to prolonged delays and slow progress.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    Chhattisgarh CM: PRAGATI Portal Resolves 91% State Challenges

    January 29, 2026

    Discover Rajim: Where Vishnu Rests and Kumbh Magic Unfolds

    January 29, 2026

    2 Days to Rajim Kumbh: Half-Baked Plans Spark Outrage

    January 28, 2026

    Tourism becomes Chhattisgarh’s economic engine, culture becomes identity, archaeology becomes pride; achievements of two years change the picture

    January 28, 2026

    Jubilee Medal will be an indelible mark of police’s indomitable courage, valor, and sacrifice in maintaining peace and security in the state: Chief Minister Mr. Sai

    January 28, 2026

    Chief Minister Shri Vishnudev Sai Expresses Deep Condolences on the Sudden Demise of Maharashtra Deputy Chief Minister Shri Ajit Pawar

    January 28, 2026
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.