Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Dube Smashes 15-Ball 50: Joins Elite Indian T20I Record List
    • Republic Day 2026: Navy and Maharashtra Lead Awards Tally
    • Mass Resignations Rock BJP in UP Over UGC Higher Ed Equity Controversy
    • Bangladesh Extends Streak, Netherlands Debuts in 2026 Women’s T20 WC Qualifiers
    • Leaders Applaud Murmu’s Visionary Parliament Speech
    • Hanuman Beniwal Seeks Repatriation of 63 Indians Stuck in Russia Warzone
    • Shilpa Shetty: Big Brother Victory Amid Racial Abuse
    • Mamata Sees Politics Everywhere: BJP’s RP Singh on Pawar Tragedy
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»India»Madhya Pradesh»Amazing; The first floor of the hospital sank before its inauguration, now even the engineers are worried about the mistake

    Amazing; The first floor of the hospital sank before its inauguration, now even the engineers are worried about the mistake

    Madhya Pradesh September 13, 20242 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Amazing; The first floor of the hospital sank before its inauguration, now even the engineers are worried about the mistake
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Water on the first floor of a 4 storey hospital building

    Highlights

    New hospital in Gohad is being built in flood affected area. Hospital is being built at a cost of Rs 16 crore. Wrong place for hospital, engineers admit

    Anil Tomar, Gohad: The structure of the new building of a four-storey hospital near the Baseli Dam in Gohad has been completed. Currently, the first floor of the new building is filled with water. Due to the under-construction hospital being in the submerged area of ​​the dam, the hospital management and patients may have to suffer the consequences in the future. The work of building a 100-bed hospital was started on 29 September 2020 near the Baseli Dam.

    The officials did not pay attention

    The construction of the new hospital is being done at a cost of Rs 16.68 crore. 15 hectares of land has been identified. The land that has been identified for the construction of the hospital is in the flood-affected area, yet the senior administrative officials of that time ignored this fact and gave permission for the construction.

    The hospital was to be built at another place first

    Earlier, the land lying behind Gohad Chauraha, Mau Road and the present Gohad Hospital was inspected for construction of the new hospital building. But the then collector, Gohad SDM and CMHO rejected all these places and permitted construction work to be carried out in the flood-affected area.

    A new hospital building is being constructed in the flood affected area of ​​Gohad. I do not have any information in this regard. Something can be said clearly only after getting the information.

    Sanjeev Srivastava, Collector.

    Now even engineers are admitting their mistake

    After the water filled at the place where the construction of the hospital building is going on in Gohad, the departmental engineers are now admitting their mistake of not selecting the right land for the hospital. Let us tell you that before constructing any hospital, a proper survey is done, but in Gohad, negligence was shown in this regard.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    Order to stop salary of government teachers, negligence in this work

    April 10, 2025

    Tribal Development Minister Ramvichar Netam met Madhya Pradesh Chief Minister Dr. Mohan Yadav

    April 9, 2025

    CM Mohan gave a check of one crore to the martyr’s family, said- the government with the family

    April 8, 2025

    CM Mohan blessed two thousand couples in marriage in Jhabua, said

    April 7, 2025

    Now the accused will not be called sex workers, police will not arrest women caught from brothels operated on dhabas, hotels

    April 6, 2025

    Cyber ​​thug case in Bhopal, police caught four accused

    April 5, 2025
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.