Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Legend Nadal Touches Down for Australian Open Night of Stars
    • Suraiya: 70 Films, 300+ Songs, No Music Lessons Needed
    • NEET Aspirant Death: CBI Takes Over as Bihar Vows Justice for Victim’s Family
    • Bhilwara Raid Exposes Online Betting Syndicate on Cricket Matches
    • How Pathik’s QR Tech Secured Gujarat Hotel Check-Ins
    • New Delhi Pro Volleyball League Set to Revolutionize Sport
    • Modi Hails Ramsar Status for UP Bird Sanctuary and Gujarat Wetland
    • Prasarita Padahastasana: Yoga for Muscle Strength and Tension Relief
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»India»Chennai Infrastructure Gets a Lift: NHAI Announces Six-Lane Elevated Corridor

    Chennai Infrastructure Gets a Lift: NHAI Announces Six-Lane Elevated Corridor

    India August 20, 20252 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Chennai Infrastructure Gets a Lift: NHAI Announces Six-Lane Elevated Corridor
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The National Highways Authority of India (NHAI) has approved a significant infrastructure project in Chennai: a six-lane elevated corridor spanning from Poonamallee to Madhuravoyal. This initiative, with an estimated cost of ₹1,250 crore, is designed to improve access for vehicles arriving from Bengaluru, Krishnagiri, and Vellore, thereby strengthening the city’s western infrastructure. Tenders for this 8.1 km elevated corridor have been released, with construction slated to commence in the next three months and a planned completion timeline of two and a half years. The corridor will feature entry and exit points exclusively at the beginning and end and will be a toll road. The project director for NHAI in Chennai, I.S. Janakumaran, said that about 90,000 vehicles use this section daily. Construction plans include maintaining 10 lanes, including service lanes, to mitigate any impact on traffic flow. The travel time along the corridor will be significantly reduced. When linked to the Outer Ring Road and Sriperumbudur corridor, the 22 km journey will take less than 20 minutes. The project should also accelerate cargo handling at Chennai Port. Suggestions from the local community include upgrading the service lanes and expediting construction. In addition to this project, NHAI is also working on a four-lane Thiruvarur bypass and National Expressway-7.

    Chennai Chennai Port Elevated Corridor Highways infrastructure Madhuravoyal NHAI Poonamallee Traffic Congestion Transportation
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    NEET Aspirant Death: CBI Takes Over as Bihar Vows Justice for Victim’s Family

    January 31, 2026

    Bhilwara Raid Exposes Online Betting Syndicate on Cricket Matches

    January 31, 2026

    How Pathik’s QR Tech Secured Gujarat Hotel Check-Ins

    January 31, 2026

    Modi Hails Ramsar Status for UP Bird Sanctuary and Gujarat Wetland

    January 31, 2026

    Prasarita Padahastasana: Yoga for Muscle Strength and Tension Relief

    January 31, 2026

    Radhika Sarathkumar Rules South Cinema with Latest Award Win

    January 31, 2026
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.