Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Mamata Sees Politics Everywhere: BJP’s RP Singh on Pawar Tragedy
    • 2 Days to Rajim Kumbh: Half-Baked Plans Spark Outrage
    • Rising Attacks on Transgender People in Pakistan Spark Outrage
    • PM Modi Signals $130B Energy Investments to Global CEOs
    • T20 World Cup Blow: USA’s Aaron Jones Provisionally Banned Over Fixing Claims
    • Bollywood Legends: Om Puri’s Funny Amrish Pranks Revealed
    • India-M Malaysia Team Up: Deport 3 Wanted Gang Members via Interpol
    • Terror Funds Flow: Pakistan Groups Mask as Charity Networks
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»India»Jharkhand»Elevated corridor will be built over Harmu river, construction will be done from Harmu to Kadru.

    Elevated corridor will be built over Harmu river, construction will be done from Harmu to Kadru.

    Jharkhand September 28, 20242 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Elevated corridor will be built over Harmu river, construction will be done from Harmu to Kadru.
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Ranchi: To make the capital jam free, work of widening the roads including three flyovers and construction of new roads is going on. Now the Road Construction Department has prepared a plan to connect Harmu Bypass Road and Main Road to make them jam-free. An elevated corridor will be built over the Harmu river to connect the two major roads. An elevated corridor will be constructed from Harmu Muktidham to Hotel Radiance Blue, Kadru Mod. This elevated corridor of about 2.50 km long will also be connected to the proposed flyover in Harmu Bypass Road, so that the vehicles coming from Kanke Road can go to the main road via Kachari Road or Circular Road – the coming vehicles can directly climb the Harmu flyover and go towards the main road. Can do.

    “To explore the possibility of an elevated corridor, the engineers of the road division, including the executive engineer of the field survey advance plan of the road construction department, have inspected the site. After which the possibility of building an elevated corridor on double pillars in the empty area on the banks of Harmu river was expressed. There will be pillars on both sides of the river, an elevated corridor will be built above it and the river below will remain intact. After the report of the survey team, the Road Construction Secretary has given instructions to prepare the Detailed Project Report (DPR) of the scheme. Consultant is to be selected by October 10.

    Preparation to connect elevated corridor with main road flyover near Tapovan temple

    The total length of Harmu River from Vidyanagar to Namkum Swarnarekha River in the city is 10.5 km. In such a situation, the possibility of connecting an elevated corridor from Harmu Muktidham to Main Road flyover is being explored. In the first phase, work will be done from Harmu Muktidham to Kadru Mod. After this, the possibility of connecting it with the Sirmtoli Mecon elevated corridor being built above the main road ROB from Kadru Mod will be explored. It will pass from Tapovan temple via Nivaranpur, so that all the major roads of the city will be connected to each other. This will save people’s time and the problem of traffic jam will be completely eliminated.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    Strict Enforcement in Ranchi Stadiums After DC Bhajantri’s Warning

    January 28, 2026

    Hemant Soren’s Emotional Tribute to Ajit Pawar After Fatal Baramati Crash

    January 28, 2026

    77th Republic Day Celebrated at IIIT Ranchi, National Flag Hoisted by Director Prof. Rajiv Srivastava

    January 28, 2026

    Jealous Rage Ends in Cousin Murder: Dumka Police Nab Killer

    January 27, 2026

    JMM Unhappy with Padma Bhushan for Shibu Soren, Wants Bharat Ratna Instead

    January 25, 2026

    Former Ranchi Councilor Suman Devi Rallies Ward 39 for Municipal Elections

    January 25, 2026
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.