Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Dube Smashes 15-Ball 50: Joins Elite Indian T20I Record List
    • Republic Day 2026: Navy and Maharashtra Lead Awards Tally
    • Mass Resignations Rock BJP in UP Over UGC Higher Ed Equity Controversy
    • Bangladesh Extends Streak, Netherlands Debuts in 2026 Women’s T20 WC Qualifiers
    • Leaders Applaud Murmu’s Visionary Parliament Speech
    • Hanuman Beniwal Seeks Repatriation of 63 Indians Stuck in Russia Warzone
    • Shilpa Shetty: Big Brother Victory Amid Racial Abuse
    • Mamata Sees Politics Everywhere: BJP’s RP Singh on Pawar Tragedy
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»India»Gaganyaan Mission Advances: ISRO’s Air Drop Test Signals Progress

    Gaganyaan Mission Advances: ISRO’s Air Drop Test Signals Progress

    India August 24, 20251 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Gaganyaan Mission Advances: ISRO’s Air Drop Test Signals Progress
    Share
    Facebook Twitter LinkedIn Pinterest Email

    ISRO’s recent Integrated Air Drop Test (IADT-01) marks a key achievement for the Gaganyaan mission, which focuses on the parachute-based deceleration system. This test is designed to assess the safety features required for astronauts’ safe return. The test was a collaborative effort, including the Indian Air Force, DRDO, Indian Navy, and Indian Coast Guard. The agency announced the success on ‘X’. India’s first uncrewed mission of the Gaganyaan programme, G1 with Vyommitra, the half-humanoid robot, is scheduled for December. According to ISRO officials, the mission is on track, with most tests completed and the remainder scheduled to finish by March next year. The Human Rated Launch Vehicle (HLVM3) is ready. The Orbital Module’s propulsion systems for the Crew Module and Service Module have been tested. The Crew Escape System (CES) has been developed and tested. Infrastructure development for the mission includes the Orbital Module Preparation Facility, Gaganyaan Control Centre, and crew training facilities. Precursor missions, like the TV-D1, are progressing to validate the Crew Escape System (CES). Flight operations and communication network configurations are finalized. Plans for crew recovery operations are in place. Major components of the first Uncrewed Mission (G1) have been completed.

    Air Drop Test Astronaut Safety Gaganyaan HLVM3 Indian Space Program isro Parachute System space mission Uncrewed Mission Vyommitra
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    Republic Day 2026: Navy and Maharashtra Lead Awards Tally

    January 29, 2026

    Mass Resignations Rock BJP in UP Over UGC Higher Ed Equity Controversy

    January 28, 2026

    Leaders Applaud Murmu’s Visionary Parliament Speech

    January 28, 2026

    Mamata Sees Politics Everywhere: BJP’s RP Singh on Pawar Tragedy

    January 28, 2026

    2 Days to Rajim Kumbh: Half-Baked Plans Spark Outrage

    January 28, 2026

    India-M Malaysia Team Up: Deport 3 Wanted Gang Members via Interpol

    January 28, 2026
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.