Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Nia Sharma’s Epic Laughter Chefs S3 Comeback Sparks Social Media Frenzy
    • 40ft Underground: Meet Shiva’s Dad at Varanasi’s Secret Shrine
    • Invisible Wall Blocks Pakistan Girls’ Schooling Journey
    • History in Making: Divya Deshmukh’s Youngest Norway Chess Women Debut
    • UGC Regulations Frozen by Supreme Court: Anand Dubey Slams Govt
    • Kabaddi Glory: Railways, Haryana Advance in Women’s Nationals
    • From Comfort Zone to Ring: Pulkit Samrat’s Glory Transformation
    • Bengal Police Arrests 3 in Ex-MP Mimi’s Alleged Harassment Row
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»Sports»PM Gatishakti Plan: Center Speeds Up Work on 8 Road, Railway and Metro Projects | Economy News

    PM Gatishakti Plan: Center Speeds Up Work on 8 Road, Railway and Metro Projects | Economy News

    Sports March 14, 20254 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    PM Gatishakti Plan: Center Speeds Up Work on 8 Road, Railway and Metro Projects | Economy News
    Share
    Facebook Twitter LinkedIn Pinterest Email

    New delhi: The 89th Meeting of the Network Planning Group (NPG) Evaluated 8 Infrastructure Projects in the Road, Railway, and Metro Sector to Enhance Multimodal Connectivity and Logistics Efficiency in Afffficiency in Alignment White The PM Gatishakti National Master Plan, According to a Statement Issued by the Ministry of Commerce and Industry on Friday.

    These initiatives are expected to boost logistical efficiency, Reduce Travel Times, and Deliver Significant Socio-Economic Benefits Accounts Regents, The Statement Said. The four projects evaluated in the road sector include the development of a two-lane highway from darugiri to dalu section in meghalaya. The project involves the development of the existing road into a two-lane highway with a Paved Shoulder Along the Darugiri to Dalu Section of NH-62 (New NH-217) in Megalaya.

    This 136.11 km-long stretch passes through East Garo Hills, South Garo Hills, and West Garo Hills, Significly enhancing Regional Connectivity. Given its strategic location, this corridor is essential for facilitating cross-border trade and regional economic development.

    The Second Project Pertains to the Construction of a Four-Lane Tunnel Connectivity Across River Brahmaputra Between Gohpur and Numaligarh. The project involves the construction of India’s first-ever road tunnel beneath a major river.

    The Four-Lane Tunnel under the Brahmaputra will reduce travel time from 6.5 hours to just 30 minutes, shortening the distance from 240 km to 34 km. This twin-tube, unidiresly underwater tunnel will enhance connectivity to Arunachal Pradesh, Manipur, and other Northeastern States.

    The widening and improvement of the existing carries to four lanes of the kaliaber-numaligarh section was also taken up for evaluation. This project aims to upgrade the existing highway from two lanes to four lanes along the kaliabor-numaligarh section (NH-37/NH-715) in Assam.

    Covering 85.67 km Across Nagaon, Karbi Anglong, And Golaghat Districts, The Project incorporates Wildlife-Firendly Measures Such as An Elevated Corridor and Wildlife Crot Kaziranga National Park’s Biodirsity.

    The fourth road projects involves the connection of a two-lane highway from Mayjhilar to Jaisalmer with Jaisalmer bypass Link Road. Spanning 138.177 km, this project in Rajasthan Includes Brownfield and Greenfield Stretches Along NH-11 and NH-70. It aims to improve regional connectivity, boost tourism, facilitate defense movement, and enhance road safety.

    The three projects of the ministry of Railways that was taken up if included the third and fourth line expansion on Badlapur-Karjat Route. The 32.460 km-long brownfeield project addresses Increasing Passenger and Freight Convention Along The Mumbai-Pune-Solapur-Wadi-Chennai Corridor.

    Enhancing Connectivity Between Key Commuter HUBS and Freight Transit Points, This Project will Benefit Towns Including Badlapur, Vangani, Shelu, NERALU, NERALU, NERALU, and Karjat. The second railway project involves the construction of the fourth line from nergundi to cuttack with a flyover at nergundi.

    The 15.99 km-long brownfield railway infrastructure project in Odisha Aims to Decongest existing Rail Lines, Facilitate Freight Movement, and ENSURE SMOTHER Operations ALONG ALONG ALONG AKEY CORIDORIDON PARDIP Port, Talker Coalfields, and Major Steel and Power Industries.

    The third Railway Project Covers The Construction of a Doubling Line from Haridaspur to Paradip. The 74.09 km-long brownfeield project in Odisha will enhance freight transportation capacity and logistics efficiency, facilitating seamless coal transportation from talchre coalfields to Paradip Port while supporting industry expansion in the angul-jharsuguda cluster.

    The Rajkot Metro Rail Project was also taken up for evaluation. This is a greenfield urban transport initiative aimed at reduction congestion and providing a sustainable mode of transport in Gujarat’s Rajkot. Covering 41.11 km, The Project Integrates Seamlessly With Existing Urban Infrastructure, ENSURING MULTIMODAL Connectivity with Regional Rail, CITY BUS SERVICES, And INTERMIDITE Public Transport Such as autos and cycle rickshaws.

    “These infrastructure projects, aligned with the PM gatishakti national master plan, will significantly enhance connectivity, improvement, improve logistics, and constribute to regional and nocial Economic Growth,” Statement added.

    PM gatishakti plan
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    History in Making: Divya Deshmukh’s Youngest Norway Chess Women Debut

    January 29, 2026

    Kabaddi Glory: Railways, Haryana Advance in Women’s Nationals

    January 29, 2026

    Pak Hockey Strike Ends: Players Clear Air for Pro-League Matches

    January 29, 2026

    Sabalenka Chases Third Straight Title; Rybakina Stands in the Way

    January 29, 2026

    U19 World Cup: Viran Chamuditha’s 110 Powers Sri Lanka Past SA

    January 29, 2026

    Deepti Sharma’s 55* Guides UP Warriors to 144 Target Against RCB

    January 29, 2026
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.