Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Ajit Pawar Death: Mamata Banerjee Alleges BJP Exit Plot
    • Saudi-Iran Leaders Stress Unity Against US Threats in Key Phone Talk
    • Djokovic Semifinal Streak Hits 13 Despite Musetti’s Brave Fight and Injury
    • Baramati Crash Sparks Debate: Pilot Urges Safety Overhaul in India
    • Trump Eases Tariff Threats Against South Korea Ally
    • Chaos in Parliament: Murmu Hails Rural Job Scheme, Opposition Revolts
    • Tragic Plane Crash Kills Ajit Pawar: 3 Days Mourning in Maharashtra
    • Phoebe Litchfield Injury Shakes UP Warriors in WPL 2026 Race
    Facebook X (Twitter) Instagram
    Report Wire
    • World
    • India
      • Chhattisgarh
      • Jharkhand
      • Bihar
    • Entertainment
    • Sports
    • Tech
    • Business
    • Health
    Report Wire
    Home»India»Chhattisgarh»Raipur’s Road to Recovery: Seven Overbridges to Tackle Traffic Snarls

    Raipur’s Road to Recovery: Seven Overbridges to Tackle Traffic Snarls

    Chhattisgarh July 28, 20252 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Raipur’s Road to Recovery: Seven Overbridges to Tackle Traffic Snarls
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Raipur is on the cusp of a significant transformation with the approval and construction of seven new overbridges, aimed at mitigating the city’s long-standing traffic issues. This ambitious project, a first for Raipur, has been greenlit with the PWD set to complete the construction within a year. The locations for these overbridges were carefully chosen based on data identifying areas with the most severe traffic congestion and accident rates. These overbridges are designed to improve traffic flow, enhance road safety, and reduce commute times by approximately 20 minutes on each affected road.

    The overbridges are planned at the following locations:

    * **Kali Bari to Police Line Gate:** A 1.5-kilometer-long overbridge will be built, costing ₹50 crore.
    * **Fundhar Chowk to Temri:** A flyover will be constructed at Fundhar Chowk. The cost is estimated at ₹30 crore.
    * **Amlidih Chowk to Dronacharya School:** An overbridge will be built over the Canal Linking Road, with a projected cost of ₹40 crore.
    * **Gudhiyari to Expressway Flyover:** A flyover is planned to connect Shukrawari Bazar in Gudhiyari to the Expressway.

    Additional locations include:

    * **Mova:** An overbridge is planned from Khalsa School to Mova Reliance Mart. The estimated cost is around ₹135 crore.
    * **Bhanpuri Chowk:** An overbridge will be constructed at Bhanpuri Chowk, with an estimated cost of ₹40 crore.
    * **Kharun River:** An overbridge is proposed to connect Raipur and Patan, with an estimated cost of ₹60 crore.

    chhattisgarh Commuting development Flyovers infrastructure Overbridges pwd raipur Road Safety Traffic Congestion
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    RELATED NEWS

    India Weather Chaos: Delhi Rain Alert, Himachal Snow Warnings, J&K Paralysis

    January 28, 2026

    24-Hour Weather Chaos: Snowstorms Grip North India

    January 27, 2026

    7-Year Affair Ends in Murder: Dragged and Disfigured

    January 27, 2026

    Chhattisgarh Youth Get Job Alerts via New Mobile App

    January 25, 2026

    Chhattisgarh Village Shocker: Widow Paraded Nude After Beating Over Romance

    January 25, 2026

    Setback for Baghel: CBI Overturns Discharge in Obscene CD Probe

    January 25, 2026
    -Advertisement-
    © 2026 Report Wire. All Rights Reserved.
    • Terms & Conditions
    • About Us
    • Privacy Policy
    • Contact

    Type above and press Enter to search. Press Esc to cancel.