Light rain and thunderstorms forecast.
Highlights
Heavy rainfall predicted in northern regionHeavy rain in Indore and UjjainWeather likely to clear in Bhopal
Naiduniya Representative, Bhopal: Due to the trough line passing through the northern region of the state, the weather department has predicted heavy rainfall in Sagar, Rewa and Shahdol on Tuesday. There is a possibility of light drizzle in the remaining divisions of the state. On Monday, heavy rainfall occurred in eight districts of Indore and Ujjain divisions.
rain with thunder
According to the Meteorological Department, eight districts including Alirajpur, Jhabua and Dhar will receive light rainfall in the next 24 hours. Light rain and thundershowers will continue in Barwani, Indore, Ratlam, Ujjain, Dewas, Mandsaur, Bhind, Morena, Singrauli, Mauganj, Sidhi, Panna and Chhatarpur.
weather system active
Meteorologist Ajay Shukla said that there is a deep depression in eastern Rajasthan. Its effect will be seen in the west and south-west direction up to Gujarat, Pakistan and Kutch. At the same time, there is a very low pressure area in Bengal. On August 29, a low pressure system will become active in the Bay of Bengal. This may cause light rainfall in entire Madhya Pradesh.
Light drizzle in Bhopal
On Monday, the sun came out in the afternoon after three days in the capital Bhopal. However, there was also light drizzle during the day. Due to the rain, the temperature of the city has dropped. According to the Meteorological Department, the weather will clear up in the city during the next twenty-four hours. There may be light drizzle at some places.
Temperatures in cities
City Max. Min. Bhopal 28.8 22.8
Gwalior
32.9 25.7
Indore
24.5
22.0
Jabalpur
29.4 23.4
Note: Temperature in degrees Celsius
Three gates of Bansagar dam were opened
Due to heavy rains in Shahdol district for the last five days, Bansagar dam was filled to the brim, due to which first two gates of the dam were opened at 1 pm on Monday, after which one more gate was opened. On Monday, 341 meters of water was recorded in the dam at 8 am.
After this, at 1 pm, the water level was recorded up to 341.06 meters. After this, it was decided to release the water of the dam, after which at 1 pm, first two gates were opened and after some time another gate was opened by 1.5 meters. The water level of the dam is 341.64 meters.